Tasks
Tasks display to-do lists on your screens. Connect Google Tasks, create a list by hand in BrandCast, or both — every connected list appears together in one Tasks content item.
What it looks like on a display
Section titled “What it looks like on a display”Tasks render as a single scrollable list. Each task shows a checkbox (filled when complete), its title, and its due date if it has one — overdue tasks show the due date in red. When you’ve connected more than one list, a legend below the tasks shows which color belongs to which list.
Task sources
Section titled “Task sources”The Tasks tab supports these source types:
| Source | How it connects |
|---|---|
| Google Tasks | Google account OAuth |
| Manual List | Typed directly into BrandCast, no account needed |
You can connect multiple sources of either type — tasks from all of them appear together.
Adding tasks to your display
Section titled “Adding tasks to your display”Step 1: Connect a source
Section titled “Step 1: Connect a source”- Click Content in the sidebar.
- Click the Tasks tab.
- Click Add Source.
- Choose Google Tasks or Manual List, give the source a name, and click Create.
- For Google Tasks, a Google sign-in window opens if you aren’t already connected — sign in and allow access. For a manual list, you’re dropped straight into adding tasks (see Manual Tasks).
Connecting a Google Tasks source pulls in every list in that Google account — there’s no option to pick individual lists.
Step 2: Create a Tasks content item
Section titled “Step 2: Create a Tasks content item”- From the Hub’s add-content grid, or the page editor’s + Add rail, add a Tasks item.
- Under Task Lists, select the sources you connected. Leaving this empty shows no tasks.
- Set the display options below.
- Save, then place it on a Page.
Settings
Section titled “Settings”| Setting | Description |
|---|---|
| Task Lists | Which connected sources to include |
| Filter by Tags | Only include sources that have one of these tags (tags are managed in the Tasks tab) |
| Max Tasks | Maximum number of tasks shown (1–100, default 20) |
| Sort By | Position (manual order), Due Date, Title, or Last Updated |
| Show Completed Tasks | Whether finished tasks are included |
Colors, fonts, and spacing come from the design area, not from these settings — see Design editor.
- Connect multiple task sources to get everything in one place on screen.
- Sort by Due Date to put the most urgent tasks first.
- For a break room display, keep Show Completed Tasks off so the screen only shows what’s left to do.
Troubleshooting
Section titled “Troubleshooting”Tasks aren’t appearing. Check that at least one source is selected under Task Lists in the content item’s settings. If you’re using Google Tasks, open Stores, click the store, and check that Google Tasks shows Connected under Integrations.
Tasks are outdated. Google Tasks syncs on its own schedule. On the Tasks tab, find the source card and click the sync icon (Sync Now) to force an immediate sync.
Tasks are out of order. Change the Sort By setting — Due Date puts the soonest-due tasks first.
